Missing crosswalk
The path crosses a road here and nothing on the road says so. Paint, a sign and a curb cut would do it.
45 places where the trail network stops, doubles back, or sends you onto a road. Each one is somewhere a specific, buildable thing would fix a specific problem — a crossing, a deck, a light, a kilometre of path. Narrow them down by what they would cost and by how badly they are wanted, and the argument makes itself. The cheapest thing that would do the most good is always first.
Showing all 45
The path crosses a road here and nothing on the road says so. Paint, a sign and a curb cut would do it.
A busy street with no signal where the trail meets it. People cross anyway, in gaps in the traffic.
The severed spur. Reconnecting it means a structure and land that nobody is currently selling.
A proposal drawn on the built route itself, rather than out on a line of its own.
A proposed line leaving the trail at 0.37 and rejoining it at 0.63 — the longest of the five.
On a spur that leaves the trail and simply stops — so its card arrives where the spur leaves.
On the proposed loop at the eastern end, which leaves at 0.76 and rejoins at 0.88.
A proposal on the built route, in the middle of the busiest stretch of the page.
The far side of the eastern loop, two thirds of the way along it.
The trail stops and the road starts. A few hundred metres of path would carry it across.
Six lanes and no signal for the trail
Two hundred metres would join the subdivision
The trail stops at the curb and starts again after
A path around the reservoir, promised since 2009
A four-lane road with no signal and no crossing. It is the most dangerous point on the West Humber.
The rail corridor cuts the valley in two and there is no way under it. A tunnel, or a long way round.
The detour through the car park could be a bridge
Thirty steps where a ramp would do
A crossing that needs a signal. The corridor is straight and fast either side of it.
A hydro corridor severed by four lanes
The corridor is there; the path is not
Pedestrians, bikes and a beach in four metres
The last unbuilt stretch of the eastern shore
Wall on one side, water on the other, and the busiest trail in the city pinched between them.
The bridge is already standing and already closed. It needs a deck and railings, and nothing else.
The climb out of the valley is a car park
Where the valley meets the road
A kilometre of valley with no path in it. The trail picks up again on the far side.
The two halves of the valley, joined
A crossing nobody signed
The last hundred metres are stairs
The path stops at the embankment
Two ravines, one street apart
Six lanes across the corridor
Not built yet, and already funded — this one is coming whether or not anyone argues for it.
Where the hydro corridor is fenced
The creek goes under; the trail does not
A ravine connection, half built
A dark, wet underpass that people avoid after dusk. Lighting would change what it is.
Nothing matches both of those. and start again.